Hardware NPI Costing & Capex
5
Minutes Read
Published
September 7, 2025
Updated
September 7, 2025

Hardware NPI Budget Framework for Deeptech Startups: Concept to Mass Production Planning

Learn to build a robust hardware NPI budgeting process, from initial concept to mass production, to accurately forecast costs and secure funding for your project.
Glencoyne Editorial Team
The Glencoyne Editorial Team is composed of former finance operators who have managed multi-million-dollar budgets at high-growth startups, including companies backed by Y Combinator. With experience reporting directly to founders and boards in both the UK and the US, we have led finance functions through fundraising rounds, licensing agreements, and periods of rapid scaling.

NRE vs. COGS: The Two Halves of a Hardware Development Budget

For a Deeptech startup, the path from concept to a physical product is a high-stakes obstacle course. Your New Product Introduction (NPI) budget is more than a spreadsheet for an investor deck; it is the operational playbook that dictates your runway. According to a 2021 Fictiv State of Manufacturing report, 78% of NPI projects experience delays, each one a direct threat to your financial plan. A robust hardware NPI budgeting process is the difference between shipping a product and becoming a cautionary tale.

Before building a budget, you must understand the two fundamental cost types in hardware: Non-Recurring Engineering (NRE) and Cost of Goods Sold (COGS). For early-stage startups, getting this distinction right from the start simplifies every financial conversation with your team, suppliers, and investors.

Non-Recurring Engineering (NRE) represents your one-time investments to get ready to manufacture your product at scale. These are expenses you pay once per major version to enable production. Key NRE categories include:

  • Development & Prototyping: The costs of early versions and test units.
  • Tooling & Fixtures: The custom molds, jigs, and equipment needed for mass production.
  • Certifications: The mandatory testing required to legally sell your product in target markets like the UK or USA.
  • Pilot Runs: The cost of initial, small-scale production runs to validate the manufacturing process.

Cost of Goods Sold (COGS), on the other hand, represents the recurring, per-unit costs you incur for every device you produce. It directly impacts your gross margin and long-term profitability. COGS is primarily driven by:

  • Bill of Materials (BOM): The cost of every component, from the main processor to the last screw.
  • Labor, Overhead & Handling (LOH): The costs associated with assembly, factory overhead, and logistics.

Understanding this division is the first step. NRE is your upfront capital expenditure hurdle, while COGS determines your product's sustainable profitability. For formal accounting, IFRS provides guidance on capitalising development costs under IAS 38, while US-based companies follow US GAAP principles.

Forecasting NRE: A Core Part of the Hardware NPI Budgeting Process

Accurately forecasting NRE is crucial for managing cash flow and timing large capital outlays with funding tranches. This is where many startups stumble, underestimating the costs that can drain a bank account before the first unit is sold. Let's break down the major NRE components.

Development and Prototype Cost Estimation

Early prototypes are essential for testing, but they are expensive. They are often made with low-volume methods like 3D printing or CNC machining and use off-the-shelf components. As a known fact, prototype parts can cost 10-100x the final unit cost. Your budget must account for multiple iterations across key development milestones: Engineering Validation Test (EVT), Design Validation Test (DVT), and Production Validation Test (PVT).

Tooling and Fixtures

This is often the largest single NRE expenditure. For plastic parts, injection molds can range from $10,000 (simple, low-volume) to $100,000+ (complex, high-volume). This cost is a direct function of your product's complexity and expected production volume. Changing a physical design after a hard tool is cut is incredibly expensive, so it is vital to have the design finalized before this stage.

Certifications

Getting your product certified for sale is non-negotiable. For electronics sold in the US and Europe, FCC/CE testing can run $15,000-$50,000 per product. This process is notoriously prone to delays and unexpected failures that require costly re-testing. As a result, standard guidance for underestimation of certification: Add 30% to timeline estimates and 20% to cost quotes.

To manage this, map your NRE costs to your development timeline. You can find more details on stage-gate budgeting in the EVT/DVT/PVT guide. Consider this simple forecast:

  • EVT Stage (Concept Validation):
    • Prototype Units (5-10): $25,000 (at high per-unit cost)
    • Initial Lab Equipment: $10,000
  • DVT Stage (Design & Feature Freeze):
    • Pre-Tooling Prototype Units (20-50): $50,000
    • Initial Certification Pre-scans: $5,000
  • PVT Stage (Production Readiness):
    • Injection Mold Tooling: $80,000 (Major Capex Outlay)
    • Full FCC/CE Certification: $40,000 (plus 20% buffer)
    • Assembly Jigs & Fixtures: $15,000

This milestone-based approach lets you align large cash outlays with funding events, preventing a runway crisis. Finally, add a general NRE Contingency buffer of 15-20% to the total. This buffer isn't for new features; it’s for the problems you haven't discovered yet.

Taming COGS for Sustainable Production Scaling Costs

While NRE is a one-time mountain to climb, COGS is a persistent force that determines your profitability on every unit sold. Your manufacturing ramp financial planning starts with a detailed Bill of Materials (BOM). Monitoring design changes and supply chain fluctuations is essential to prevent unit costs from quietly destroying your margins.

Your BOM should list every component, supplier, and cost at various volume breaks. But components are only part of the story. You must also account for:

  • Labor: The cost to assemble each unit.
  • Overhead & Handling (LOH): A percentage added by your contract manufacturer to cover their operational costs.
  • Yield Loss: Not every unit will pass final inspection. A good initial manufacturing yield assumption is 95-98%. This means for every 100 units you want to sell, you need to start and pay for roughly 102 to 105 units.

You can compare contract manufacturer quotes effectively using manufacturing partner cost models. To see how NRE and COGS decisions interact, consider two examples:

Mini-Case Study 1: Consumer IoT Smart Plug. This device is simple and designed for millions of units. A founder might invest heavily in NRE ($150,000+) for highly-automated tooling to drive the per-unit BOM and labor cost down to just a few dollars. The high NRE is justified by the extremely low COGS needed to compete in a mass market.

Mini-Case Study 2: B2B Deeptech Lab Instrument. This is a complex, low-volume device. The founder will likely use simpler tooling to minimize NRE, perhaps keeping it under $40,000. However, the BOM is packed with expensive sensors, pushing the COGS for each unit into the thousands of dollars. Here, the priority is minimizing upfront capital risk.

Your COGS estimate also needs a buffer. The supply chain is volatile, and prices can change unexpectedly. A COGS Contingency buffer of 5-10% is a pragmatic way to protect your margins from these fluctuations and absorb minor price increases. For a deeper dive, model your inventory cash needs with the working capital guide.

Your Budget as a Living Tool for Strategic Decisions

The most significant mistake founders make is treating the budget as a static document. Your NPI budget must be a living tool for active, strategic decision-making. This is about rigorous Budget vs. Actuals tracking, and you can learn about common issues in the budget variance guide.

You do not need complex enterprise software at this stage. Your existing setup of QuickBooks or Xero is sufficient. Each month, your process should be simple:

  1. Export Actual Spending: Pull your actual expenses from your accounting software, typically QuickBooks for US companies or Xero for UK startups.
  2. Categorize and Compare: Map these actuals back to your NRE and COGS budget categories in your spreadsheet.
  3. Analyze Variances: Where did you overspend or underspend? Investigate the reasons behind significant differences.

This regular analysis is your early warning system. Is a component consistently costing more than quoted? That is a signal to engineering to find an alternative. Did a prototype run require an extra iteration? That variance tells you to draw from your NRE contingency and communicate the timeline impact to investors.

This process transforms the budget from an accounting exercise into a powerful communication tool. When you can show investors not just your plan, but also how you are tracking against it, you build immense credibility. It demonstrates operational discipline and allows you to have proactive conversations about challenges, backed by data, rather than reactive requests for cash.

Your NPI Financial Checklist and Beyond

The hardware NPI budgeting process can feel overwhelming, but it boils down to a few core principles. It requires a disciplined approach to forecasting, a realistic view of risk, and a commitment to using the budget as an active management tool.

Your NPI financial checklist should start with the fundamental split: meticulously separate one-time NRE costs from recurring, per-unit COGS. Next, map large NRE expenditures to development milestones (EVT, DVT, PVT) and align them with your funding strategy. Build in buffers for the unexpected; a 15-20% contingency for NRE and a 5-10% buffer for COGS are essential for risk management.

Once development is underway, use your budget as a dynamic guide. Regularly track your actual spending against your plan to catch cost creep early. This discipline is what allows you to maintain control over your production scaling costs.

Finally, the journey doesn't end at mass production (MP). Your NPI budget should flow directly into a post-production roadmap for margin improvement. A typical first-year post-production goal: reduce COGS by 10-20%. This is achieved through volume purchasing, supplier negotiations, and designing for cost reduction. Your first budget is your baseline, a starting point for the continuous refinement that will define your company's long-term success.

Frequently Asked Questions

Q: How does the hardware NPI budgeting process differ for a low-volume versus high-volume product?
A: For low-volume products, the focus is on minimizing NRE (e.g., using simpler tooling) to reduce upfront capital risk, even if it means higher per-unit COGS. For high-volume products, a larger NRE investment in automated tooling is justified to achieve the lowest possible COGS and compete on price at scale.

Q: What is the most commonly underestimated cost in a hardware development budget?
A: Certifications (like FCC/CE) and tooling are the most frequently underestimated NRE costs. Certifications often face unexpected delays and failures requiring re-testing, while tooling for complex parts can be significantly more expensive than initial quotes. A contingency of 15-20% on total NRE is crucial.

Q: Why is separating NRE and COGS so important for early-stage hardware funding?
A: Separating NRE from COGS provides clarity for investors. NRE represents the one-time capital expenditure required to get to market, which aligns with funding rounds. COGS determines the unit economics and gross margin, which demonstrates the long-term profitability and scalability of the business model to potential backers.

This content shares general information to help you think through finance topics. It isn’t accounting or tax advice and it doesn’t take your circumstances into account. Please speak to a professional adviser before acting. While we aim to be accurate, Glencoyne isn’t responsible for decisions made based on this material.

Curious How We Support Startups Like Yours?

We bring deep, hands-on experience across a range of technology enabled industries. Contact us to discuss.